Project

Lévis plant

Name of project owner :

City of Lévis

Description

Upgrading of drinking water supply infrastructures and increase in capacity of the Desjardins drinking water production plant to 75,000 m³/d.

Contribution

Ballasted floc decanters, conventional filters, distribution pumps, chemical dosing, lime silo, ozone and ultraviolet production systems.

Location

Lévis

Value

13,800,000 $

Year of completion

2009-2011

Whatever the scope of your project, CWA executes the work to meet our customers' needs in the fastest, most cost-effective way, always with quality and safety in mind.

The diversified service offerings of our company and our divisions cover the following areas:

  • Construction
  • Equipment repair and maintenance
  • Management and operations

Contact us

Name(Required)
Address(Required)
Service type (optional)

Privacy Policy

2024 CWA mécanique inc. | All rights reserved | Site by DevBuddy