CITY OF ST-JEAN-SUR-RICHELIEU
Services provided :
Disciplines :
The project consists mainly of the construction of facilities such as a composting plant, an administrative building with a maintenance garage, biofilters for odour management, storage domes on BCR slabs, an integrated water management system and other systems, as well as the commissioning of the composting plant currently under construction on Rang des Cinquante-Quatre in the borough of St-Jean-sur-Richelieu.
This work will be complemented by the installation of related water management systems and all other fire protection equipment.
On this project, CWA worked as a subcontractor for the supply and installation of mechanical process equipment, the service water distribution system, the leachate distribution system and the installation of aerated floors.
As the site is not served by a water supply network, a tube well was drilled and a service water supply system had to be installed.
779 RANK OF THE FIFTY-FOUR
$1.4 M
MAI 2022 À MARS 2023